☊❐㍿pvc floor self-adhesive sticker leather thick and wear-resistant < (1)
☊❐㍿pvc floor self-adhesive sticker leather thick and wear-resistant < (2)
☊❐㍿pvc floor self-adhesive sticker leather thick and wear-resistant < (3)
☊❐㍿pvc floor self-adhesive sticker leather thick and wear-resistant < (4)

Sell ☊❐㍿pvc floor self-adhesive sticker leather thick and wear-resistant < best price

0
ratings
MYR 81
Brand
No Brand
Ships from
Kuala Lumpur
Variation
>1.8mm wood grain
>1.8mm wood grain1
>1.8mm wood grain2
>1.8mm wood grain3
>1.8mm wood Grain
>1.8mm wood grain5
>1.8mm wood grain6
>1.8mm wood grain7
>1.8mm wood grain8
>1.8mm wood grain9
>1.8mm wood grain10
>1.8mm wood grain11
>1.8mm wood grain12
>1.8mm wood grain13
>2.0mm wood grain
>2.0mm wood grain15
>2.0mm wood grain16
>2.0mm wood grain17
>2.0mm wood grain18
>2.0mm wood grain19

Product Description

korean Construction method of self-adhesive PVC floor 1. The self-adhesive PVC floor cannot be exposed to rain or direct sunlight, and should be placed flat in a place with a room temperature above 20 degrees Celsius. Before laying in winter or summer, you should put the floor in the room to be laid for 24 to 48 hours, and then lay it after adapting to the temperature of the room. 2. The ground or newly paved cement floor must be completely dried before construction, generally more than 30 days, if well ventilated, more than 3 weeks. Special attention: the ground should be surveyed before the construction of self-adhesive PVC floor. The water content is less than 40% before construction. 40%~60% is special ground. It is better to try to lay a small area before confirming the construction, more than 60% Can not be constructed at the time. One or two pieces of floor can be placed flat on the ground and sealed with tape on all four sides. After 6 to 12 hours, see if there is enough moisture on the back of the floor for testing. For construction below 15 degrees Celsius, the floor should be preheated in the room with heating equipment for 24 to 48 hours, and 0.1 to 0.15 mm gaps should be left during laying. 3. Before construction, the ground must be thoroughly cleaned. If there are unevenness or other defects, they should be polished or flattened. Ceramic tiles, terrazzo, wooden floors, cement floors (as long as the bonded ground is flat and dust-free (Sand grains are fine) When the ground is severely sanded, it should be repainted with 801 glue and black cement. It is recommended to use self-leveling cement. After the self-leveling is done, the water content is below 40% before laying. Water-soaked floors can be paved, PS: Not recommended for use in toilets. Floor leather type: multi-layer composite type Shape: flake

Related items

You may also like